WindSuite™ by Cv International: A Complete, Turn-Key Solution for Wind Turbine Nitrogen Servicing

BEND, Ore., Feb. 28, 2025 /PRNewswire/ — Cv International’s WindSuite™ is setting a new standard for wind turbine maintenance by offering a fast, safe, and efficient nitrogen servicing solution tailored for the renewable energy industry. With a fully integrated system—including a nitrogen generator, high-performance booster, explosion-proof fill station, and the portable WindKit—WindSuite eliminates long wait times and enhances safety for wind technicians working at extreme heights.

Continue Reading

The WindSuite™ streamlines wind turbine maintenance with FOUR key actions: Supply, Boost, Bottle and Service.
The WindSuite™ streamlines wind turbine maintenance with FOUR key actions: Supply, Boost, Bottle and Service.

Major industry leaders such as Siemens Energy, Vestas American Wind Technology, and Clearway Energy Wind Power Plants have embraced the WindSuite for its reliability and performance.

“We used to rely on Steady-Fill ‘like’ pumps to fill small portable nitrogen bottles for uptower servicing, but they took 4 to 6 hours to fill an 88 scfm high-pressure cylinder. With the Cvi WindSuite, that same job now takes just 8 to 10 minutes! Huge time savings, greater safety, efficiency, and no more waiting.” — Windfarm Operations

WindSuite’s 4 Key Actions:

The WindSuite™ streamlines wind turbine maintenance with FOUR key actions: 

Supply high-purity nitrogen on-site with a SNG 3 Nitrogen Generator or high-pressure storage cylinders
Boost pressure to 5000 psig with Cvi’s N-Series Booster
Bottle nitrogen cylinders to 4500 psig safely with the CFS 5.5 Nitrogen Fill Station
Service turbines safely and efficiently with Cvi’s WindKit

Industry Growth & Expanding Reach

Cvi is strengthening its presence in the wind energy sector with a rapidly growing national distributor network. WindSuite systems are already in operation across multiple states, including Texas, Indiana, Arizona, Colorado, and Washington, supporting wind farm operators in maximizing efficiency. Visit us at O&M and Safety Conference, Gaylord Opryland Resort & Convention Center, Nashville, TN – March 3 – March 5 (Booth #329)

Key Advantages of WindSuite:

 10x Faster Servicing: Reduce nitrogen fill times from 4-6 hours to just 8-10 minutes
  Improved Safety: Eliminates high-pressure cylinder transport, reducing risks to technicians
 Cost-Effective & Reliable: Cuts maintenance costs and increases turbine uptime
 Sustainable Solution: Supports wind energy operations with an eco-friendly servicing approach

A Commitment to Renewable Energy

Dan Warden, CEO of Cv International, emphasized the company’s dedication to sustainability and innovation:

For more information or media inquiries, please contact:

George Darcy
Chief Marketing Officer[email protected]
541-480-1716

About Cv International

For over 40 years, Cv International has been a leader in delivering high-performance nitrogen systems, contaminated fuel detectors, cryogenic samplers, and advanced maintenance solutions for industries such as Wind Energy, Aviation, Hydro Electric, and Oil & Gas. Headquartered in Bend, Oregon, Cv International is a Veteran-Owned Small Business (VOSB) committed to innovation and sustainability. Visit us at cvintl.com

SOURCE Cv International


Go to Source