Highlights
A review of the Company’s drill core assay dataset has identified multiple distinct areas of considerable cesium enrichment (>1% Cs2O)
Primary zone of enrichment is coincident with the Company’s high-grade lithium Vega Zone (CV13) and can be traced in drill holes over a very large area of approximately 600 m x 400 m and remains open in several directions.
Pollucite, the principal and preferred ore mineral for cesium, has been identified by XRD mineralogical analysis at the CV13 Pegmatite and is interpreted to be the principal source of the cesium enrichment at the Property. A more focused mineralogical program is underway.
This extremely rare Cesium mineral has the potential to become a meaningful by-product to future lithium operations.
Cesium results in drill hole and channel include:
10.4 m at 1.30% Cs2O, including 4.0 m at 2.02% Cs2O (CV23-117) at CV5.
10.6 m at >1.00% Cs2O (CV24-754) at CV13 – Cs overlimit analysis pending1
7.1 m at >1.00% Cs2O (CV24-520) at CV13 – Cs overlimit analysis pending1
0.5 m at 9.58% Cs2O (Channel CH22-047) – CV12
Overlimit (>1% Cs) assay results for cesium are pending for more than 140 individual core samples with final grade-width calculations for drill holes to be reported once received.
Economic deposits are typically on the scale of <10 kt to 350,000 kt in size, compared to typical lithium pegmatite deposits that range in the millions of tonnes (<10 Mt and rarely over 100 Mt) in size.
The Company understands that there are only a handful of operators globally currently producing Cesium products, resulting in it being a highly rare and valuable commodity given it has a number of significant industrial applications.
____________________________ |
|
1 |
Assay results exceeded the upper detection limit (10,000 ppm Cs) of the base analytical package and require subsequent overlimit analysis using a different analytical package to determine the Cs grade. Overlimit analysis is now pending to determine actual grades and will be reported once received. |
Darren L. Smith, Patriot Executive and Vice President of Exploration, comments: “The identification of multiple zones of extensive cesium mineralization in drill hole at Shaakichiuwaanaan is very significant. Cesium pegmatite occurrences over 1% Cs2O are very rare and represent only the most fractioned and evolved portion of a pegmatite body. Although the focus for the Company is lithium pegmatite and advancing CV5 to production, there is a clear opportunity to potentially delineate a pollucite (cesium) zone of significant scale. Moreover, given the scarcity and value of cesium, there is a strong potential to further enhance stakeholder value.”
VANCOUVER,BC, March 2, 2025 /PRNewswire/ – March 3, 2025 – Sydney, Australia
Patriot Battery Metals Inc. (the “Company” or “Patriot”) (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce the discovery of a large zone of cesium mineralization at the CV13 Pegmatite, which forms part of the Company’s wholly owned Shaakichiuwaanaan Property (the “Property” or “Project”), located in the Eeyou Istchee James Bay region of Quebec.
Figure 1: Areas of significant cesium enrichment, with approximately 100 individual core samples pending overlimit analysis (>1% Cs). (CNW Group/Patriot Battery Metals Inc.)
Table 1: Attributes for drill holes and channels discussed herein. (CNW Group/Patriot Battery Metals Inc.)
Figure 2: Tanco Mine and chemical plant site at Bernic Lake, Manitoba, (Source: Tanco website). (CNW Group/Patriot Battery Metals Inc.)
Table 2: Attributes for drill holes and channel discussed herein. (CNW Group/Patriot Battery Metals Inc.)
The Shaakichiuwaanaan Property hosts a consolidated Mineral Resource Estimate2 (“MRE”) of 80.1 Mt at 1.44% Li2O Indicated and 62.5 Mt at 1.31% Li2O Inferred. The CV5 Spodumene Pegmatite, which forms the bulk of the MRE, is accessible year-round by all-season road and is situated approximately 14 km from a major hydroelectric powerline corridor. The CV13 Pegmatite is located <3 km along geological trend from the CV5 Pegmatite.
With the geological and block models for the CV5 Pegmatite now handed off to the Feasibility Study team, the Company has further reviewed its core assay dataset and identified multiple distinct areas of considerable cesium (Cs) enrichment (>1% Cs). These include the CV5 and CV12 pegmatites; however, the two (2) largest zones are hosted by the CV13 Pegmatite. Cesium results in drill hole and channel (Figure 1, Table 1, and Table 2) include:
10.4 m at 1.30% Cs2O, including 4.0 m at 2.02% Cs2O (CV23-117) at CV5.
10.6 m at >1.00% Cs2O (CV24-754) at CV13 – Cs overlimits pending
7.1 m at >1.00% Cs2O (CV24-520) at CV13 – Cs overlimits pending
0.5 m at 9.58% Cs2O (Channel CH22-047) – CV12
Overlimits (>1% Cs2O) are pending for cesium for more than 140 core samples from the 2024 summer-fall drill program, including approximately 100 from the CV13 Pegmatite. Overlimits are required when the analytical result exceeds the upper detection limit of the analytical package, which in this case is >10,000 ppm Cs (i.e., 1% Cs). Final cesium grade-width calculations for drill holes CV24-520, CV24-754, as well as multiple others, will be reported once overlimit analysis for cesium are received.
Two (2) distinct areas of cesium enrichment have been identified at CV13 (Figure 1). The principal and largest of the cesium zones is coincident with the high-grade (lithium) Vega Zone and can be traced in drill hole over an extensive area of approximately 600 m x 400 m, ranging in thickness from 1-2 m to at least 10 m (core length). The second zone is associated with the apex of the structural flexure at CV13 and is estimated through drilling to be at least ~250 m x 50 m in area and up to several metres thick.
__________________________________ |
|
2 |
Shaakichiuwaanaan (CV5 & CV13) Mineral Resource Estimate (80.1 Mt at 1.44% Li2O and 163 ppm Ta2O5 Indicated, and 62.5 Mt at 1.31% Li2O and 147 ppm Ta2O5 ppm Inferred) is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.80% Li2O (underground CV13) with an Effective Date of August 21, 2024 (through drill hole CV24-526). Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. |
Pollucite, the principal and preferred ore mineral for cesium, has been identified by XRD mineralogical analysis at Shaakichiuwaanaan and is interpreted to be the source of the cesium enrichment at the Property. A mineralogical program focused on areas of cesium enrichment is underway.
As a next step, the Company will use its drill and surface sampling data to geologically model the zone of cesium enrichment within the wider pegmatite body at each of the main occurrences, with the focus on the Vega Zone area of CV13. Additionally, cesium will be added to the block model to further assess the occurrences.
The identification of significant pollucite mineralization at CV13 presents an opportunity to further evaluate the potential of cesium as a marketable by-product, which could complement the Company’s lithium-focused development strategy. As the Feasibility Study for CV5 progresses, the Company will assess the potential for a cesium resource at Shaakichiuwaanaan and its implications for future exploration and development.
About Cesium – extremely rare critical metal
Cesium (Cs) is a specialty metal and is listed as a critical and strategic mineral by Canada, the province of Quebec (Canada), Japan, and the United States. The principal use of cesium, which is almost exclusively recovered (in its primary form) from the mineral pollucite, is in the form of cesium formate brine. Due to its high-density, low toxicity, biodegradable nature, and recoverability, it is used to support the completion of oil and gas wells at high pressure and temperature.
Cesium is also used in atomic clocks, GPS, aircraft guidance, and telecommunications. Its compounds have various applications: cesium carbonate in fuel cells, cesium chloride in chemistry and nuclear medicine, cesium hydroxide in batteries, cesium iodide in X-ray equipment, cesium nitrate in pyrotechnics and scintillation counters, and cesium sulfates in water treatment and scientific instruments.
Mineral deposits of cesium (pollucite) are extremely rare and represent the most fractionated component of LCT pegmatites, which are effectively the only primary source of cesium globally. Economic deposits are typically on the scale of <10 kt to 350,000 kt in size, compared to typical lithium pegmatite deposits that range in the millions of tonnes (<10 Mt and rarely over 100 Mt) in size. Examples of the few current/past producing mines include Tanco (Canada, Figure 2), Bikita (Zimbabwe), and Sinclair (Australia). Australia's first commercial cesium mine, Sinclair, extracted its last cesium in 2019.
Quality Assurance / Quality Control (QAQC)
A Quality Assurance / Quality Control protocol following industry best practices was incorporated into the program and included systematic insertion of quartz blanks and certified reference materials into sample batches at a rate of approximately 5% each. Additionally, analysis of pulp-split sample duplicates was completed to assess analytical precision, and external (secondary) laboratory pulp-split duplicates were prepared at the primary lab for subsequent check analysis and validation.
All samples collected were shipped to SGS Canada’s laboratory in Val-d’Or, QC, or Radisson, QC, for sample preparation (code PRP90 special) which includes drying at 105°C, crush to 90% passing 2 mm, riffle split 250 g, and pulverize 85% passing 75 microns. The pulps were shipped by air to SGS Canada’s laboratory in Burnaby, BC, where the samples were homogenized and subsequently analyzed for multi-element (including Li, Cs, and Ta) using sodium peroxide fusion with ICP-AES/MS finish (codes GE_ICP91A50 and GE_IMS91A50).
Overlimits for cesium are requested when the analytical result exceeds the upper detection limit (10,000 ppm Cs) of the GE_ICP91A50 and GE_IMS91A50 analytical packages. The overlimit package used for cesium is GC_AAS49C – acid digestion for alkaline elements – and reports Cs in %.
Qualified/Competent Person
The information in this news release that relates to exploration results for the Shaakichiuwaanaan Property is based on, and fairly represents, information compiled by Mr. Darren L. Smith, M.Sc., P.Geo., who is a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects, and member in good standing with the Ordre des Géologues du Québec (Geologist Permit number 01968), and with the Association of Professional Engineers and Geoscientists of Alberta (member number 87868). Mr. Smith has reviewed and approved the technical information in this news release.
Mr. Smith is an Executive and Vice President of Exploration for Patriot Battery Metals Inc. and holds common shares and options in the Company.
Mr. Smith has sufficient experience, which is relevant to the style of mineralization, type of deposit under consideration, and to the activities being undertaken to qualify as a Competent Person as described by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr. Smith consents to the inclusion in this news release of the matters based on his information in the form and context in which it appears.
About Patriot Battery Metals Inc.
Patriot Battery Metals Inc. is a hard-rock lithium exploration company focused on advancing its district-scale 100%-owned Shaakichiuwaanaan Property (formerly known as Corvette) located in the Eeyou Istchee James Bay region of Quebec, Canada, which is accessible year-round by all-season road and is proximal to regional powerline infrastructure. The Shaakichiuwaanaan Mineral Resource1, which includes the CV5 & CV13 spodumene pegmatites, totals 80.1 Mt at 1.44% Li2O Indicated, and 62.5 Mt at 1.31% Li2O Inferred, and ranks as the largest lithium pegmatite resource in the Americas, and the 8th largest lithium pegmatite resource in the world.
A Preliminary Economic Assessment (“PEA”) was announced for the CV5 Pegmatite August 21, 2024, and highlights it as a potential North American lithium raw materials powerhouse. The PEA outlines the potential for a competitive and globally significant high-grade lithium project targeting up to ~800 ktpa spodumene concentrate using a simple Dense Media Separation (“DMS”) only process flowsheet.
____________________________________ |
|
1 |
Shaakichiuwaanaan (CV5 & CV13) Mineral Resource Estimate (80.1 Mt at 1.44% Li2O and 163 ppm Ta2O5 Indicated, and 62.5 Mt at 1.31% Li2O and 147 ppm Ta2O5 ppm Inferred) is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.80% Li2O (underground CV13) with an Effective Date of August 21, 2024 (through drill hole CV24-526). Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. |
For further information, please contact us at [email protected] or by calling +1 (604) 279-8709, or visit www.patriotbatterymetals.com. Please also refer to the Company’s continuous disclosure filings, available under its profile at www.sedarplus.ca and www.asx.com.au, for available exploration data.
This news release has been approved by the Board of Directors.
“KEN BRINSDEN”
Kenneth Brinsden, President, CEO, & Managing Director
Olivier Caza-Lapointe
Head, Investor Relations – North America
T: +1 (514) 913-5264
E: [email protected]
Disclaimer for Forward-looking Information
This news release contains “forward-looking information” or “forward-looking statements” within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management’s current expectations and plans that allow investors and others to have a better understanding of the Company’s business plans and financial performance and condition.
All statements, other than statements of historical facts included in this news release, regarding the Company’s strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Forward-looking statements are typically identified by words such as “underway”, “potential”, “to become”, “future”, “to be”, “focus”, “opportunity”, “advancing to production”, “further enhance”, “will”, “next step” and similar words or expressions. Forward-looking statements in this release include, but are not limited to, statements on the Feasibility Study and the potential of cesium at Shaakichiuwaanaan as a marketable by-product.
Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Company’s forward-looking information is based include, without limitation, that proposed exploration and mineral resource estimate work on the Property will continue as expected, the accuracy of reserve and resource estimates, the classification of resources between inferred and the assumptions on which the reserve and resource estimates are based, long-term demand for spodumene supply, and that exploration and development results continue to support management’s current plans for Property development and expectations for the Project.
Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Company’s business, any of which could have a material adverse effect on the Company’s business, financial condition, results of operations and growth prospects. Some of the risks the Company faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others, the ability to execute on plans relating to the Company’s Project, including the timing thereof. In addition, readers are directed to carefully review the detailed risk discussion in the Company’s most recent Annual Information Form filed on SEDAR+, which discussion is incorporated by reference in this news release, for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations.
Although the Company believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements.
Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Company’s business plans, financial performance and condition and may not be appropriate for other purposes.
The forward-looking statements contained herein are made only as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Company qualifies all of its forward-looking statements by these cautionary statements.
Competent Person Statement (ASX Listing Rule)
The mineral resource estimate in this release was reported by the Company in accordance with ASX Listing Rule 5.8 on August 5, 2024. The Company confirms that, as of the date of this announcement, it is not aware of any new information or data verified by the competent person that materially affects the information included in the announcement and that all material assumptions and technical parameters underpinning the estimates in the announcement continue to apply and have not materially changed. The Company confirms that, as at the date of this announcement, the form and context in which the competent person’s findings are presented have not been materially modified from the original market announcement.
The production target referred to in this release was reported by the Company in accordance with ASX Listing Rule 5.16 on August 21, 2024. The Company confirms that, as of the date of this announcement, all material assumptions and technical parameters underpinning the production target in the original announcement continue to apply and have not materially changed.
Appendix 1 – JORC Code 2012 Table 1 (ASX Listing Rule 5.7.1)
Section 1 – Sampling Techniques and Data
Criteria |
JORC Code explanation |
Commentary |
Sampling techniques |
Nature and quality of sampling (eg cut channels, random chips, or specific specialized industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.
|
Core sampling protocols meet industry standard practices.
|
Drilling techniques |
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).
|
Holes are NQ or NQ3 size core diamond drilling with Core was not oriented.
|
Drill sample recovery |
Method of recording and assessing core and chip sample recoveries and results assessed.
|
All drill core was geotechnically logged following industry standard practices, and include TCR, RQD, ISRM, and Q-Method. Core recovery is very good and typically exceeds 90%.
|
Logging |
Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.
|
Upon receipt at the core shack, all drill core is pieced together, oriented to maximum foliation, metre marked, geotechnically logged (including structure), alteration logged, geologically logged, and sample logged on an individual sample basis. Core box photos are also collected of all core drilled, regardless of perceived mineralization. Specific gravity measurements of pegmatite are also collected at systematic intervals for all pegmatite drill core using the water immersion method, as well as select host rock drill core.
|
Sub-sampling techniques and sample preparation |
If core, whether cut or sawn and whether quarter, half or all core taken.
|
Drill core sampling follows industry best practices. Drill core was saw-cut with half-core sent for geochemical analysis and half-core remaining in the box for reference. The same side of the core was sampled to maintain representativeness.
|
Quality of assay data and laboratory tests |
The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.
|
Core samples collected from drill holes were shipped either to SGS Canada’s laboratory in Val-d’Or, QC, or Radisson, QC for standard sample preparation (code PRP90 special) which included drying at 105°C, crush to 90% passing 2 mm, riffle split 250 g, and pulverize 85% passing 75 microns. Core sample pulps were shipped by air to SGS Canada’s laboratory in Burnaby, BC, where the samples were homogenized and subsequently analyzed for multi-element (including Li and Ta) using sodium peroxide fusion with ICP-AES/MS finish (codes GE_ICP91A50 and GE_IMS91A50).
|
Verification of sampling and assaying |
The verification of significant intersections by either independent or alternative company personnel.
|
Intervals are reviewed and compiled by the VP Exploration and Project Managers prior to disclosure, including a review of the Company’s internal QAQC sample analytical data.
|
Location of data points |
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.
|
Each drill hole’s collar has been surveyed with a RTK Trimble Zephyr 3 or Topcon GR-5, with small number of holes and channels by average handheld GPS.
|
Data spacing and distribution |
Data spacing for reporting of Exploration Results.
|
At CV5, drill hole collar spacing is dominantly grid based. Several collars are typically completed from the same pad at varied orientations targeting pegmatite pierce points of ~50 (Indicated) to 100 m (Inferred) spacing.
|
Orientation of data in relation to geological structure |
Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.
|
No sampling bias is anticipated based on structure within the mineralized body.
|
Sample security |
The measures taken to ensure sample security.
|
Samples were collected by Company staff or its consultants following specific protocols governing sample collection and handling. Core samples were bagged, placed in large supersacs for added security, palleted, and shipped directly to Val-d’Or, QC, or Radisson, QC, being tracked during shipment along with Chain of Custody. Upon arrival at the laboratory, the samples were cross-referenced with the shipping manifest to confirm all samples were accounted for. At the laboratory, sample bags are evaluated for tampering.
|
Audits or reviews |
The results of any audits or reviews of sampling techniques and data.
|
A review of the sample procedures for the Company’s 2021 fall drill program (CF21-001 to 004) and 2022 winter drill program (CV22-015 to 034) was completed by an Independent Competent Person and deemed adequate and acceptable to industry best practices (discussed in a technical report titled “NI 43-101 Technical Report on the Corvette Property, Quebec, Canada”, by Alex Knox, M.Sc., P.Geol., Issue Date of June 27th, 2022.)
|
Section 2 – Reporting of Exploration Results
Criteria |
JORC Code explanation |
Commentary |
Mineral tenement and land tenure status |
Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.
|
The Shaakichiuwaanaan Property (formerly called “Corvette”) is comprised of 463 CDC claims located in the James Bay Region of Quebec, with Lithium Innova Inc. (wholly owned subsidiary of Patriot Battery Metals Inc.) being the registered title holder for all of the claims. The northern border of the Property’s primary claim block is located within approximately 6 km to the south of the Trans-Taiga Road and powerline infrastructure corridor. The CV5 Spodumene Pegmatite is accessible year-round by all-season road is situated approximately 13.5 km south of the regional and all‑weather Trans-Taiga Road and powerline infrastructure. The CV13 and CV9 spodumene pegmatites are located approximately 3 km west-southwest and 14 km west of CV5, respectively.
|
Exploration done by other parties |
Acknowledgment and appraisal of exploration by other parties.
|
No core assay results from other parties are disclosed herein.
|
Geology |
Deposit type, geological setting and style of mineralization.
|
The Property overlies a large portion of the Lac Guyer Greenstone Belt, considered part of the larger La Grande River Greenstone Belt and is dominated by volcanic rocks metamorphosed to amphibolite facies. The claim block is dominantly host to rocks of the Guyer Group (amphibolite, iron formation, intermediate to mafic volcanics, peridotite, pyroxenite, komatiite, as well as felsic volcanics). The amphibolite rocks that trend east-west (generally steeply south dipping) through this region are bordered to the north by the Magin Formation (conglomerate and wacke) and to the south by an assemblage of tonalite, granodiorite, and diorite, in addition to metasediments of the Marbot Group (conglomerate, wacke). Several regional-scale Proterozoic gabbroic dykes also cut through portions of the Property (Lac Spirt Dykes, Senneterre Dykes).
|
Drill hole Information |
A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: easting and northing of the drill hole collar If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.
|
Drill hole attribute information is included in a table herein.
|
Data aggregation methods |
In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.
|
Length weighted averages were used to calculate grade over width.
|
Relationship between mineralization widths and intercept lengths |
These relationships are particularly important in the reporting of Exploration Results. . |
At CV5, geological modelling is ongoing on a hole-by-hole basis and as assays are received. However, current interpretation supports a principal, large pegmatite body of near vertical to steeply dipping orientation, flanked by several subordinate pegmatite lenses (collectively, the ‘CV5 Spodumene Pegmatite’)
|
Diagrams |
Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.
|
Please refer to the figures included herein as well as those posted on the Company’s website.
|
Balanced reporting |
Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.
|
Please refer to the table(s) included herein as well as those posted on the Company’s website.
|
Other substantive exploration data |
Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.
|
The Company is currently completing site environmental work over the CV5 and CV13 pegmatite area.
|
Further work |
The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).
|
The Company intends to continue drilling the pegmatites of the Shaakichiuwaanaan Property, focused on the CV5 Pegmatite and adjacent subordinate lenses, as well as the CV13 Pegmatite and related prospective corridors.
|
SOURCE Patriot Battery Metals Inc.
WANT YOUR COMPANY’S NEWS FEATURED ON PRNEWSWIRE.COM?
440k+Newsrooms &Influencers
9k+Digital MediaOutlets
270k+JournalistsOpted In